About Majd Aljubory

  • Academic Level  Bachelor's degree
  • Age  38 - 42 Years
  • Gender  Male
  • Viewed 1

About me

•Highly accomplished Mechanical Construction Engineer with 15+ years of experience delivering steel structures and power plant projects for leading global OEMs including GE,Alstom& Mapna. •Successfully managed over 10 metal fabrication projects (factories,hangars, halls) exceeding $3M in value. •Proven leadership of 50–70+ member teams in mechanical erection, workshop fabrication, and multidisciplinary site management,consistently controlling budgets and schedules while enforcing rigorous QA/QC and HSE standards to minimize delays and cost overruns. •Effectively coordinates stakeholders –clients, subcontractors, and suppliers – to achieve on-time, on-budget project completion and seamless operational startups.

Bottom Promo

Education

Experience

  • 2026 - Present
    Engineering Section Group

    Construction Team Leader

    Led construction teams, directing on-site activities, resource allocation, and daily
    progress to consistently achieve project milestones.
    Enforced HSE and QC standards via toolbox talks, inspections, and incident
    management, ensuring safe and compliant operations.
    Collaborated with clients, subcontractors, and suppliers to proactively resolve technical
    and logistical challenges, maintaining project schedules.
    Mentored junior engineers and technicians, streamlining workflows to enhance
    productivity and deliver high-quality results.

  • 2021 - 2025
    Smart Engineering Industries

    Site Manager

    Led full-cycle site operations for 10+ steel structure EPC projects (factories,
    warehouses, car parks) exceeding $3M in value, consistently delivering projects on
    time and maintaining zero major safety incidents.
    Oversaw end-to-end steel structure execution – fabrication, assembly, and erection –
    ensuring adherence to design specifications and quality standards. •Managed and
    optimized a 50+ person multidisciplinary workforce, increasing site productivity by
    through performance monitoring and efficient task allocation. •Enforced HSE
    regulations, QA/QC procedures, and work permit systems to guarantee full regulatory
    and contractual compliance.
    Controlled project budgets, coordinated material procurement, and managed
    subcontractors to maximize cost efficiency.

  • 2020 - 2021
    AlTabeiaa paints (Alyaqout&Almarjan)

    Factory Manager

    Directed daily production of metal can fabrication, ensuring quality and output across
    varied product lines and volumes.
    Led and developed a team of 100+ employees.
    Streamlined logistics and implemented comprehensive maintenance programs—daily,
    weekly, monthly, and preventative—resulting in optimized operational efficiency and
    minimized downtime.

  • 2018 - 2020
    Shamara holding group / Mapna group

    Construction & Operation Engineer

    Led mechanical erection of gas turbines, generators, and auxiliary skids for the 3000
    MW Rumaila Power Plant, consistently adhering to OEM specifications.
    Supervised installation of heavy steel structures including pipe racks and support
    structures and associated mechanical equipment.
    Collaborated with multinational engineering teams to streamline on-site construction
    within an EPC framework.
    Supported commissioning and smooth transition to operation mode by monitoring plant
    performance during 12 months of post-handover reliability testing, ensuring stable and
    continuous power generation.
    Following the transition, appointed as Operation Engineer in charge of one unit, where
    responsibilities included hourly monitoring and recording of critical parameters,
    conducting visual inspections, and maintaining full readiness to implement proper
    procedures for safe start-up and shutdown.

  • 2012 - 2018
    Uruk Group/ General Electric + Alstom

    Construction Engineer & Workshop Manager

    Mechanical installation and erection of four Alstom GT13E2 gas turbine units for
    Almansuria Power Plant (760 MW) with two phases ,focusing on turbine erection,
    auxiliary equipment installation, and steel structure assembly.
    Supervised erection of heavy steel structures, including 132kV gantries, pipe racks,
    pump stations, and overhead cranes, GCB Structure, GIS Building.
    Managed site workshop with more than 70 staff including overseeing welding
    operations, fabrication activities, heavy equipment maintenance, site services.
    Ensured strict QA/QC implementation and HSE compliance across all construction and
    workshop activities.
    Participated in commissioning activities and reliability testing and operation in
    coordination with GE-Alstom engineering teams.

Languages

English
Proficient

Leave Your Review

  • Overall Rating 0